A relative value read as absolute

UnverifiedThe encoding is confirmed by the reference programs, but no file of ours in this shape has been run on a machine. Produced with a warning, refused in strict mode.

What the converter says

ZA on BohrHoriz is measured from somewhere else and is read as measured from the origin

Code: mpr_relative_value_assumed

What triggers it

The parameter is written as measured from somewhere else. This converter has read it as measured from the origin, which is right only if the reference happened to be the origin.

ZA="@10"

Example that triggers it

How to fix it

Check the position of that operation in the converted file against the drawing before cutting.

Messages this command can produce